The survey logic file reports "at least 1 error" in two variables (see survey logic file screenshot)
I assume this has something to do with the values of "(VALIDATION: .)" in the 3rd column but i'm not sure where these values come from? There is no value entered in the Validation field in General Options for the PtAge question, and the Validation field doesn't appear at all for the PtCohort question.
Assistance on LimeSurvey forum and LimeSurvey core development are on my free time.
I'm not a LimeSurvey GmbH member,
professional service on demand
,
plugin development
. I don't answer to private message.