I want to have assessment of the sum of score of 2 questions. they are array questions. There are total 3 questions.
If the assessment is: The sum is {TOTAL}, I can get the total score
If the assessment is: The sum is {SUM(DASS1.VALUE,DASS6.VALUE)}, it just shows the same text but cannot give the sum
Can you help me, please? It is urgent as I need to finish it early.
Thank you very much.
I can provide the .lss if necessary

Connexion ou Créer un compte pour participer à la conversation.

LimeSurvey Partners
Plus d'informations
il y a 2 mois 3 semaines - il y a 2 mois 3 semaines #181924 par cdorin
Réponse de cdorin sur le sujet sum of score from questions
Please provide the .lss file with the work you have done so far.
Dernière édition: il y a 2 mois 3 semaines par cdorin.

Connexion ou Créer un compte pour participer à la conversation.

Plus d'informations
il y a 2 mois 3 semaines #181932 par kwlam20
Réponse de kwlam20 sur le sujet sum of score from questions
i have a test survey.
I have 3 questions, Q01, Q02, Q03.
I can have the sum of the 3 questions, by {TOTAL}
However, I want to have sum of Q01 and Q02 but it failed
The zip file is attached. Thanks.

Fichier attaché :

Nom du fichier : surveys_archive3.zip
Taille du ficher :4 ko
Pièces jointes :

Connexion ou Créer un compte pour participer à la conversation.

Plus d'informations
il y a 2 mois 3 semaines - il y a 2 mois 3 semaines #181969 par cdorin
Réponse de cdorin sur le sujet sum of score from questions
See manual.limesurvey.org/Assessments#assessment_placeholders .

Expressions cannot be used inside assessment messages.

My advice would be to use to use only expressions. Use as last question a "text display/equation" question to display the result to your respondents.

To show whether someone is stressed or has anxiety... use the "if" condition. For examples on expressions usage, see manual.limesurvey.org/Expression_Manager_sample_surveys .

P.s. Please note that the assessment scores are not stored by default in the response table! (in case you wish to analyse them later in the future). You need to create hidden equations where to store the scores (either using assessment placeholders or expressions inside them)
Dernière édition: il y a 2 mois 3 semaines par cdorin. Raison: grammar

Connexion ou Créer un compte pour participer à la conversation.

Plus d'informations
il y a 2 mois 3 semaines #181985 par kwlam20
Réponse de kwlam20 sur le sujet sum of score from questions
Thank you very much.
I am sorry that I am in a hurry and need to finish within 2 days.
It is only a test version and my actual survey has 3 groups and 21 questions. The questions are arranged in random order not according to the groups.
Finally, I need to give their scores in each group.
In the test version, can how I give the score of anxiety as sum of question 1 and 2 and then score of stress as sum of question2 and 3.
In fact, I am new to limesurvey and I am not an IT experts. Can you teach me, please?
Should I add a new group of result, group 2 and produce 3 questions? How to produce these 3 equations from the result of the result in group 1?
Thank you very much and looking forward to your reply as I am in an urgent condition.
Thanks.

Connexion ou Créer un compte pour participer à la conversation.

Plus d'informations
il y a 2 mois 3 semaines #181986 par kwlam2020
Réponse de kwlam2020 sur le sujet sum of score from questions
In fact, I can get the subtotal score of each group.
Is it possible that I can randomize the questions on the survey but not affect the result
For example:
I have
Group1: G1Q1, G1Q2, G1Q3
Group 2: G2Q1, G2Q2, G2Q3
Group 3: G3Q1, G3Q2, G3Q3

Instead the survey as
G1Q1
G1Q2
G1Q3
G2Q1
G2Q2, etc


I would like to randomize it as
G2Q1
G3Q1
G1Q3
G2Q2
G3Q2, etc

There is function of randomization group. Can it get this way?
I have try but it seems no effect.

Please help me to solve the problem

Connexion ou Créer un compte pour participer à la conversation.

Plus d'informations
il y a 2 mois 3 semaines #181993 par DenisChenu
Réponse de DenisChenu sur le sujet sum of score from questions
In manual.limesurvey.org/Question_type_-_Sh...e_.28random_group.29 of
G1Q1,G2Q1,G3Q1 : enter Q1
G1Q2,G2Q2,G3Q2 : enter Q2
G1Q3,G2Q3,G3Q3 : enter Q3

Then you have for order
In 1st group shown : G2Q1,G3Q2,G1Q3
In 2nd group shown : G3Q1,G1Q2,G2Q3

for example

Assistance on LimeSurvey forum and LimeSurvey core development are on my free time.
I'm not a LimeSurvey GmbH member, professional service on demand .
An error happen ? Before make a new topic : remind the Debug mode .

Connexion ou Créer un compte pour participer à la conversation.

Plus d'informations
il y a 2 mois 3 semaines #182070 par kwlam20
Réponse de kwlam20 sur le sujet sum of score from questions
I have try to construct the survey as follows
Group 1: Q1, Q2, Q3 all are array with a score
Group 2: Q4: sum of Q1 and Q2 score by equation
Group 3: Q5: sum of Q2 and Q3 score by equation

I can get the numerical value in Q4 and Q5 automatically after filling in Q1, Q2, Q3

I want to get the assessment after submission as that
The score in group 2 is {PERC}
The score in group 3 is {PERC}


The first one I choose group 2 and set the minimum and maximum
The scond one I choose group 3 and set the minimum and maximum

However, the assessment is not displayed as expected and there is no assessment.

Can you help me, please?
Can it be done?

Thanks.

Connexion ou Créer un compte pour participer à la conversation.

Commencez dès maintenant !

Créez simplement un compte et commencez à utiliser LimeSurvey dès aujourd'hui.

Inscrivez-vous maintenant

Inscrivez-vous à notre Newsletter!